Remodeling Costs in Broward & Miami-Dade
Every home and every renovation is different. Your proposal is tailored to the room dimensions, existing layout, materials and the work you request. We confirm your project price after reviewing the property, measurements, selections and agreed scope.
How we price your renovation
| Renovation | Budget guidance |
|---|---|
| Full kitchen | Project-specific proposal |
| Full bathroom | Project-specific proposal |
| Condo renovation | Project-specific proposal |
| Full-home renovation | Project-specific proposal |
Kitchen remodeling: a custom proposal
We price each kitchen renovation individually after reviewing the measurements, existing layout, materials and requested work. Cabinet quantity and construction, countertop material, backsplash, demolition and installation all affect the proposal.
Moving plumbing, adding circuits, changing walls or repairing concealed damage can increase the scope. Appliances and owner-selected products are included only when the written proposal lists them. Explore our kitchen remodeling service.
Bathroom remodeling: a custom proposal
Every bathroom renovation is priced individually based on the room dimensions, layout, materials and requested work. Room size, tile coverage, waterproofing, vanity selection, fixtures, lighting and changes to plumbing affect the price.
A compact bathroom with an unchanged layout differs from a larger primary bathroom with relocated fixtures. Your proposal specifies the materials we supply and the items you purchase separately. Explore our bathroom remodeling service.
Full-home and condo renovations: a project-specific budget
We prepare these budgets after reviewing the property and rooms involved. A useful total must account for kitchen and bathroom work, flooring, building systems, finishes and access requirements. We do not publish a single price-per-square-foot figure that could hide these differences.
Condo rules may affect permitted work hours, deliveries, elevator reservations, insurance documents and flooring assemblies. Discuss these requirements before setting the construction schedule.
What changes the final price?
- The size and number of rooms being renovated.
- Cabinet, countertop, tile and fixture selections.
- Layout changes and electrical, plumbing or structural work.
- Existing conditions discovered during demolition.
- Design, permit, inspection and association requirements.
- Site access, occupied rooms and work-hour restrictions.
Permit fees, design services and association charges are included only when expressly listed in your proposal. We separate included work, allowances, owner-supplied products and exclusions so you can compare the scope clearly.
Timing and changes
A bathroom remodel typically takes 10-14 working days on site, depending on the scope and property conditions. Planning, material ordering, permits and association approvals are scheduled separately. We confirm the construction schedule for each project.
A straightforward kitchen installation may take approximately 14–21 days after the project is ready for construction. Design decisions, ordering, permits and association approvals come before that window. The written schedule is specific to your project.
Additional work is documented in a change order identifying the price and schedule effect before it proceeds. Read our remodeling process and frequently asked questions.
Remodeling budget FAQs
How is my project priced?
We prepare a custom written proposal after reviewing your measurements, selections, requested work and property conditions.
Are permits, design and association fees included?
These items are included only when expressly listed in the written proposal. Review who coordinates each approval and who pays the associated fees before signing.
Does 14–21 days include ordering and approvals?
No. That approximate window refers to a straightforward kitchen installation after the project is ready for construction. Design, material ordering, permits and association approvals come first. Your written project schedule governs the planned sequence.
How do allowances and changes affect the total?
Check which selections are allowances, which products you supply and what the proposal excludes. Additional work is documented in a change order with its price and schedule effect before it proceeds.