Bathroom Remodel in Kendall, FL: Before and After
A complete bathroom rebuild: removal of the old bathtub and installation of a new white bathtub, new tub surround and floor, a frameless glass enclosure, a new vanity and mirror cabinet, new lighting, and brushed gold fixtures throughout. Drag the slider to compare.
Start Your Project
BeforeAfter
Vanity wall · drag or use arrow keys
- Location
- Kendall, Miami-Dade County
- Room
- Standard bathroom with tub
- Duration
- 8 working days (on-site)
- Property
- Single-family home
What changed, surface by surface
Items below come from the photos on this page and our project record. This project took eight working days because the existing layout was retained and materials were ready before construction began. Our usual bathroom construction allowance is 10-14 working days on site, depending on scope and existing conditions; planning, ordering and approvals are scheduled separately.
| Area | Before | After |
|---|---|---|
| Bathtub | Existing blue bathtub | Old bathtub removed and a new white bathtub installed |
| Tub surround | Small speckled wall tile with a sliding frosted-glass door in an aluminum frame | Large-format marble-look tile to the ceiling line, built-in corner shelves and a grab bar |
| Shower enclosure | Framed sliding panels, frosted | Frameless clear glass on a brushed gold sliding rail with a towel bar |
| Fixtures | Brushed nickel finish | Brushed gold rain showerhead, handheld sprayer, tub spout and drain |
| Floor | Small square tile | Large-format polished marble-look tile with matching base |
| Vanity | Raised-panel vanity with an integrated basin top | White shaker vanity with a white top, rectangular basin, brushed gold faucet and matching knobs |
| Mirror and lighting | Framed medicine cabinet with a four-light bar | Backlit LED mirror cabinet with touch controls, plus recessed ceiling lights |
| Over-toilet cabinet | Existing wall-mounted cabinet above the toilet | Cabinet removed |
| Walls and trim | Two-tone blue paint with a decorative border | Smooth white walls, border removed, square brushed gold towel ring and hook |
| Ceiling vents | Painted vent grilles with peeling paint around them | Damaged drywall areas around the vents repaired, ceiling painted, a new white exhaust fan cover and recessed lights |
More angles
BeforeAfter
BeforeAfter
BeforeAfter
What the room looked like on day one
The ceiling around the vents had peeling paint and dark staining. We repaired the damaged drywall areas, then painted the ceiling.


After photos
Tap any photo to enlarge it.
Tell us about your bathroom project
Start with our project inquiry form. You can email project photos to info@floridaqualitybuilders.us. We will review scope, selections, permits and any condo or HOA rules before construction is scheduled.
Explore our bathroom remodeling in Miami-Dade, browse more renovation projects, or learn about remodeling in Miami and remodeling in Kendall. See all our service areas.
Start Your Project